...
House Project Markovo

Houses between Markovo and Parvenets, near Plovdiv – progress as of 23 May 2025

Monthly construction progress of the luxury houses in Markovo

Welcome back to our monthly bulletin on the construction of the luxury houses in Markovo! This month we made significant progress on all four houses, with each reaching new stages of completion. Here are the details:

House 1: solid foundations and a stable structure

This month we successfully poured the first-floor columns and built the walls. We then poured the slab above the first floor, on which the roof will sit. This slab is now curing and will be ready for striking the formwork in about three weeks, once the concrete has fully matured and is ready for the next stages.

House 2: preparing the facade and fitting the windows

The foundation waterproofing for house 2 has been laid and the scaffolding for the facade is up. The insulation has also been applied, which means we are ready for the next step – fitting the window frames and glazing. This will give the exterior a finished look and ensure comfort and energy efficiency.

House 3: ready for the roof and chimneys

The timber roof structure of house 3 is ready and the membrane has been laid. We are continuing with battening and laying the tiles, as well as building the chimney stack. These works are essential for completing the roof system and providing reliable protection against the weather.

House 4: finishing touches to the facade and roof

The facade of house 4 is almost ready: the insulation has been rendered and all the decorative elements around the windows are complete. The timber structure of the veranda roof is ready, and the flashing and rainwater elements are being installed. The battens for the HPL decorative eaves cladding are ready, and the outer render coat is still to be applied, after which the facade will be fully complete.

Levelling the yards

We have started excavation for levelling the yards of all the houses. This opens up a wide yard space with room for planting and landscape design tailored to each owner's preferences.

Read more about the hot news from the area!

Major repair of the main road between Markovo and Parvenets

As well as the progress on the houses, we want to tell you about significant improvements to the area's infrastructure. The main road giving access to the new houses – the road between Markovo and Parvenets – is undergoing a major repair and is being fully resurfaced. The project includes new utilities, as well as kerbs and carriageway drainage.

These improvements not only make the area easier to reach but also significantly improve residents' quality of life. The new utilities ensure better connectivity and easy access to essential services. Kerbs and drainage prevent standing water and reduce the risk of flooding, which is especially important for residents' safety and comfort.

This comprehensive approach to infrastructure underlines our commitment to creating a modern, convenient residential environment. We believe quality infrastructure is a key factor in our clients' satisfaction and in the value of their investment.

Construction progress as of 23 May 2025

Follow us on social media for timely updates on the construction progress:
House Type 1 - House One
50%
House Type 1 - House Two
70%
House Type 1 - House Three
60%
House Type 2 - House One
90%

Contact us

We will be happy to give you more information about the project and answer any questions you have.

Office: 2 Lebed St, Plovdiv

Open in Google Maps
Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.